The Blockbase Mining Farm In Sweden

Sweden

Current capacity

MEGABASE 1: 5MW
MEGABASE 2: 15MW

Sweden

Current capacity

MEGABASE 1: 5MW
MEGABASE 2: 15MW

Bitcoin Mining In Sweden

Some of the benefits of our data center in Sweden include:

low energy
costs

green energy (hydropower)

Natural ("free") Cooling

Strong legal framework

Politically and socially stable

Strategic Location

Energy costs are not the only factor to take into consideration for the ideal hosted mining location

Remote and secure location in Norrbotten County, Sweden

Average temperature of 1.3 ° C (34.3 ° F)

Very low seismic activity

Outside the flood plain and significant rising water

Stable political, social and legal environment

Near International Airport Skellefteå and domestic airport Luleå

Image
For obvious security reasons, the exact location of hosting facilities are best kept private. The map is intended to provide a general idea of where your mining hardware will be hosted. Our clients know the exact address and can come visit us.

100% Green Energy

We are committed to renewable sources of energy and our power comes from nearby hydro-power generators
Hydroelectric power certificate Blockbase Vattefall AB Sweden

Facility Specs

Power

  • Among lowest-average industrial electricity rates in the world
  • Connected to 3 electric-substations
  • Capacity:
    • Data center 1: 5 MegaWatt
    • Data center 2: 15 MegaWatt

Security:

  • 24/7 camera surveillance and 30 day video retention
  • Controlled access
  • Barbed wire fence around facilities
  • Security guards
  • No Wi-Fi inside the farm

Insurance:

  • Fully insured server farm against theft, water, fire and storm

Building:

  • Data center 1: 600m²
  • Data center 2: 2x800m²

Network:

  • 1 GBit core Infrastructure with dual switch redundancy
  • 100 Mbit Fiber internet uplink with failover and firewall redundancy

On-Site Support:

  • On-site manager
  • On-site engineers

Cooling:

  • Region’s cool ambient air provides natural (“free”) cooling 100% of the year
 

Development Updates

We currently own more than 15,000m2 of land in Sweden (that's more than 3 soccer fields) where we are building additional data centers and infrastructure

Construction & deployment progress:

  • May-2018: MEGABASE 2 goes live
  • Spring-2019: MEGABASE 3 goes live